Client As-Built Drawings
Dynegy, Inc (Rockingham Power Generating Co) operates five 180MW Gas Turbine generators. Solid Engineering was able to quickly update about 218 control logic and P&ID drawings with as-built revisions and saved Dynegy time and money on the task compared to the OEM supplier.


Here, we have a water treatment system that was proposed for a boutique winery seeking a cost effective and environmentally sound method to solve a waste (tank wash) water problem. This is the GE Osmonics © M-Series membrane.

< Electronic Enclosures Creo Implementation and Configuration >